SCIRT Pump Stations With the rebuild of Christchurch’s sewer lines well underway, Piletech has been involved in a large number of pump station projects. These have generally required an average pile depth of 20+ metres below ground level. Piletech has worked with SCIRT throughout the design > |
|
![]() |
Eliot Sinclair Offices In April 2012, Piletech were approached by Eliot Sinclair Land Surveyors, Engineers and Planners to work with them in developing a piling solution for their new office in Addington. Like many businesses in the region, Eliot Sinclair had been displaced from their central city > |
|
![]() |
St Andrew’s College – Preparatory school standing proud In April 2010, Piletech completed piling work on the St Andrew’s College Preparatory School building in Merivale, Christchurch. Piles were installed to depths of 14m – 17m below ground level into a dense founding layer and Mainzeal proceeded with construction of the > |
|
![]() |
Calendar Girls – Still standing tall after earthquakes In 2009 Piletech was contracted to install piles for the new Calendar Girls gentleman’s club in Christchurch. A total of 18 screw piles were installed to depths between 8.2m and 10.5m. A devastating earthquake of 6.3 magnitude struck Christchurch on 22nd of > |
|
![]() |
Papanui Substation Piletech were contracted to design, supply and install 32 piles to support the new switch-room building at Papanui Substation. Piles were installed into dense gravels at a depth of 18m, with a very consistent founding depth across the building footprint. Following the > |
|