132 Halsey Street Temporary Works  132 Halsey Street is a premium apartment complex under construction in Auckland’s rapidly growing Wynyard Quarter. Haydn & Rollett is delivering the development on behalf of Willis Bond & Co. A significant sheet pile retaining wall was required to excavate the >
Completed: No Date Specified
Location:
Application: New Foundations
Kariotahi Retaining Wall – Remote location not a problem  Kariotahi was a project requiring the retaining of a country road at the base of the Awhitu Peninsula. The project involved installing the 36 anchors and performing a load test prior to walers being installed. The site was approximately an hour from Auckland in an area of >
Completed: Jul 2005
Location: Auckland
Application: Anchoring
Grey Lynn Countdown - A tight site in a live traffic environment  The current retaining wall outside of the Countdown in Grey Lynn had been creeping to a point where there was a visible deflection in the middle of the wall. The engineer’s solution was to put anchors through the existing wall and tie them into a new retaining wall. >
Completed: Jun 2012
Location: Auckland
Application: Anchoring
Redoubt Road - Retaining anchors  Piletech were engaged to install 178 horizontal screw anchors for an retaining structure above the new SH20-1 motorway link.  The team were required to undertake a series of load tests to confirm anchor capacities as well as performing proof testing of some >
Completed: Dec 2010
Location: Auckland
Application: Anchoring
Frucor Beverages - A limited timeframe and on budget  Frucor beverages required a new bottling line to be installed in their current factory to increase production.  This included large holding tanks with the capacity of 60,000 litres. In a limited shut down period 8 x 219 dia piles were installed inside the factory utilising >
Completed: Jul 2012
Location: Auckland
Application: New Foundations
Fisher & Paykel Healthcare Headquarters  When Fisher and Paykel Healthcare took on the task of developing their new facility in Auckland, Piletech was approached at an early stage to provide specialist input and assist with the development of a cost effective foundation design.   Piletech >
Completed: Jul 2011
Location: Auckland
Application: New Foundations