Kariotahi Retaining Wall – Remote location not a problem  Kariotahi was a project requiring the retaining of a country road at the base of the Awhitu Peninsula. The project involved installing the 36 anchors and performing a load test prior to walers being installed. The site was approximately an hour from Auckland in an area of >
Completed: Jul 2005
Location: Auckland
Application: Anchoring
Grey Lynn Countdown - A tight site in a live traffic environment  The current retaining wall outside of the Countdown in Grey Lynn had been creeping to a point where there was a visible deflection in the middle of the wall. The engineer’s solution was to put anchors through the existing wall and tie them into a new retaining wall. >
Completed: Jun 2012
Location: Auckland
Application: Anchoring
Redoubt Road - Retaining anchors  Piletech were engaged to install 178 horizontal screw anchors for an retaining structure above the new SH20-1 motorway link.  The team were required to undertake a series of load tests to confirm anchor capacities as well as performing proof testing of some >
Completed: Dec 2010
Location: Auckland
Application: Anchoring
Kings Wharf  CentrePort were looking to upgrade the King's Wharf in Wellington, to allow larger ships to dock larger ships. Their solution was to retrofit screw piles in a “push-pull” mechanism to counteract the large lateral loads. However installing screw piles >
Completed: Apr 2016
Location: Wellington
Application: Anchoring
Imperial Tobacco - Screw piles bring building up to current earthquake standards  This refurbishment of an unused warehouse to be converted into offices and a gym area called for the installation of screw piles to bring the existing building up to current earthquake >
Completed: May 2012
Location: Wellington
Application: Existing Structures
Sparks House - A new foundation  Sparks House is a three level commercial building south of Christchurch city centre that suffered significant damage in the February 2011 earthquake.  Following engineering inspections, the building was deemed recoverable however, along with a complete re-fit, a new >
Completed: Jan 2012
Location: Christchurch
Application: Existing Structures