Projects
Page:
- 1
- 2
- 3
- 4
- 5
- 6
![]() |
Tram Road A TC3 home on a solid foundation This project was the first TC3 building to be constructed using screw piles in conjunction with a Firth Ribraft foundation in a residential environment. Piletech’s in-house engineering team worked to find a solution to comply > |
|
![]() |
The New Venture - Te Mahi Hou Marsden Point Refinery is New Zealand’s only oil refinery and has a reputation as one of Asia Pacific\'s safest and most reliable refineries. Piletech was contracted to install piles for the new pipe-rack to Refinery's project The New Venture-Te Mahi Hou. > |
|
![]() |
Te Koraha House - Preserving heritage Te Koraha House is a heritage structure built in 1886 by the Mayor of Christchurch, Arthur Rhodes and used by Rangi Ruru School since the 1920s. The building’s unreinforced concrete foundation was extensively damaged and experienced settlement as a result of > |
|
![]() |
St Andrew’s College – Preparatory school standing proud In April 2010, Piletech completed piling work on the St Andrew’s College Preparatory School building in Merivale, Christchurch. Piles were installed to depths of 14m – 17m below ground level into a dense founding layer and Mainzeal proceeded with construction of the > |
|
![]() |
Sparks House - A new foundation Sparks House is a three level commercial building south of Christchurch city centre that suffered significant damage in the February 2011 earthquake. Following engineering inspections, the building was deemed recoverable however, along with a complete re-fit, a new > |
|







