Christchurch - Tight site no problem for Piletech  A 3 storey reinforced concrete building suffered earthquake damage in the February 22nd 2011 Earthquake. The designer’s solution was to widen the existing ground beams currently supporting the building, to do this there was piling undertaken down both sides of the beam, >
Completed: Feb 2012
Location: Christchurch
Application: Relevelling / Existing Structures
Te Koraha House - Preserving heritage  Te Koraha House is a heritage structure built in 1886 by the Mayor of Christchurch, Arthur Rhodes and used by Rangi Ruru School since the 1920s.  The building’s unreinforced concrete foundation was extensively damaged and experienced settlement as a result of >
Completed: Sep 2011
Location: Christchurch
Application: Relevelling / Existing Structures
Christchurch Stadium - Back in operation in very tight timeframe  The New AMI stadium in Canterbury was a job that waited for no one. The construction program for the stadium was 100 days with tickets pre-sold to the opening game before construction was half completed. A fast and effective piling solution was required therefore Piletech >
Completed: Feb 2012
Location: Christchurch
Application: New Foundations
Ryman Tauranga - Fast installation equals earlier revenue generation  To optimize the construction program, a solution utilising precast ground beams was formulated whereby the buildings were completed earlier to enable the client to occupy them. Construction of this foundation system was technically difficult using conventional piling >
Completed: Jun 2011
Location: Tauranga
Application: New Foundations
Calendar Girls “ Still standing tall after earthquakes  In 2009 Piletech was contracted to install piles for the new Calendar Girls gentleman’s club in Christchurch. A total of 18 screw piles were installed to depths between 8.2m and 10.5m. A devastating earthquake of 6.3  magnitude struck Christchurch on 22nd of >
Completed: Sep 2009
Location: Christchurch
Application: New Foundations
Frucor Beverages - A limited timeframe and on budget  Frucor beverages required a new bottling line to be installed in their current factory to increase production.  This included large holding tanks with the capacity of 60,000 litres. In a limited shut down period 8 x 219 dia piles were installed inside the factory utilising >
Completed: Jul 2012
Location: Auckland
Application: New Foundations