Projects
Page:
 
 
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
 
 
Christchurch Stadium – Back in operation in very tight timeframe  The New AMI stadium in Canterbury was a job that waited for no one. The construction program for the stadium was 100 days with tickets pre-sold to the opening game before construction was half completed. A fast and effective piling solution was required therefore Piletech >
Completed: Feb 2012
Location: Christchurch
Application: New Foundations
Eliot Sinclair Offices  In April 2012, Piletech were approached by Eliot Sinclair Land Surveyors, Engineers and Planners to work with them in developing a piling solution for their new office in Addington. Like many businesses in the region, Eliot Sinclair had been displaced from their central city >
Completed: Sep 2012
Location: Christchurch
Application: New Foundations
SCIRT Pump Stations  With the rebuild of Christchurch’s sewer lines well underway, Piletech has been involved in a large number of pump station projects. These have generally required an average pile depth of 20+ metres below ground level. Piletech has worked with SCIRT throughout the design >
Completed: In Progress
Location: Christchurch
Application: New Foundations
Calendar Girls – Still standing tall after earthquakes  In 2009 Piletech was contracted to install piles for the new Calendar Girls gentleman’s club in Christchurch. A total of 18 screw piles were installed to depths between 8.2m and 10.5m. A devastating earthquake of 6.3  magnitude struck Christchurch on 22nd of >
Completed: Sep 2009
Location: Christchurch
Application: New Foundations
St Andrew’s College – Preparatory school standing proud  In April 2010, Piletech completed piling work on the St Andrew’s College Preparatory School building in Merivale, Christchurch. Piles were installed to depths of 14m – 17m below ground level into a dense founding layer and Mainzeal proceeded with construction of the >
Completed: Apr 2010
Location: Christchurch
Application: New Foundations
Papanui Substation  Piletech were contracted to design, supply and install 32 piles to support the new switch-room building at Papanui Substation. Piles were installed into dense gravels at a depth of 18m, with a very consistent founding depth across the building footprint. Following the >
Completed: Mar 2009
Location: Christchurch
Application: New Foundations / Existing Structures