Mainfreight Wellington Piletech was approached by the design consultants for this project to develop a screw pile solution for the foundations of Mainfreight’s new office and freight terminal on the Wellington waterfront, adjacent to Centreport and Westpac Stadium. Piles were > |
|
![]() |
Imperial Tobacco - Screw piles bring building up to current earthquake standards This refurbishment of an unused warehouse to be converted into offices and a gym area called for the installation of screw piles to bring the existing building up to current earthquake > |
|
![]() |
Ryman Tauranga - Fast installation equals earlier revenue generation To optimize the construction program, a solution utilising precast ground beams was formulated whereby the buildings were completed earlier to enable the client to occupy them. Construction of this foundation system was technically difficult using conventional piling > |
|
![]() |
Mangahewa Expansion Train 2 Piletech was approached by Transfield Worley in May 2012 to investigate the use of screw piles for Todd Energy's Mangahewa Expansion Train 2 project at their Mangahewa plant in Taranaki. Piletech worked closely with Transfield Worley's design team from an > |
|
![]() |
Henderson - Otahuhu Transmission Tower Upgrades The earthquake strengthening of New Zealand’s buildings and infrastructure is an on-going process, and Transpower’s transmission pylons linking Northland to the national grid are no exception. New corbels were required on a number of towers and Piletech was > |
|