Projects
Page:
 
 
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
 
 
Tram Road   A TC3 home on a solid foundation This project was the first TC3 building to be constructed using screw piles in conjunction with a Firth Ribraft foundation in a residential environment. Piletech’s in-house engineering team worked to find a solution to comply >
Completed: Apr 2013
Location: Christchurch
Application: New Foundations
Federal Street Crane Base  As Auckland’s skyline bustles with numerous tower cranes few people will understand the intricate design dilemmas that need to be balanced with constructability… and sometimes removability! With precise loads and deflection criteria, not just any foundation solution >
Completed: Dec 2015
Location: Auckland
Application: New Foundations
Henderson - Otahuhu Transmission Tower Upgrades  The earthquake strengthening of New Zealand’s buildings and infrastructure is an on-going process, and Transpower’s transmission pylons linking Northland to the national grid are no exception. New corbels were required on a number of towers and Piletech was >
Completed: Aug 2013
Location: Six Sites from Otahuhu to Avondale, Auckland
Application: Existing Structures
Mainfreight Wellington   Piletech was approached by the design consultants for this project to develop a screw pile solution for the foundations of Mainfreight’s new office and freight terminal on the Wellington waterfront, adjacent to Centreport and Westpac Stadium.  Piles were >
Completed: Dec 2010
Location: Wellington
Application: New Foundations
Piletech holds down the trench at Kirkbride  Anyone who has tried to get to the Auckland Airport at peak time has likely encountered heavy congestion.  So when the New Zealand Transport Agency were looking at options for the $146M grade separation of Kirkbride Road – Piletech’s screw piles offered a unique >
Completed: Jun 2016
Location: Auckland
Application: New Foundations
Kings Wharf  CentrePort were looking to upgrade the King's Wharf in Wellington, to allow larger ships to dock larger ships. Their solution was to retrofit screw piles in a “push-pull” mechanism to counteract the large lateral loads. However installing screw piles >
Completed: Apr 2016
Location: Wellington
Application: Anchoring