Atlas Quarter With a vision to bring people back into central Christchurch following the 2010 and 2011 earthquakes, Fletcher Living agreed a partnership with MBIE (Ministry for Building Innovation and Employment in New Zealand) to redevelop the old Atlas Foundry in Welles Street, close to > |
|
![]() |
Auckland International Airport Ltd - PIER B When Main Contractors were tendering the work for Pier B they were told by AIAL they had less than a year to complete the structure, and it wasn’t yet designed! Hawkins told their client that if they wanted any realistic chance of achieving such a lofty goal – > |
|
![]() |
Calendar Girls – Still standing tall after earthquakes In 2009 Piletech was contracted to install piles for the new Calendar Girls gentleman’s club in Christchurch. A total of 18 screw piles were installed to depths between 8.2m and 10.5m. A devastating earthquake of 6.3 magnitude struck Christchurch on 22nd of > |
|
![]() |
Christchurch - Tight site no problem for Piletech A 3 storey reinforced concrete building suffered earthquake damage in the February 22nd 2011 Earthquake. The designer’s solution was to widen the existing ground beams currently supporting the building, to do this there was piling undertaken down both sides of the beam, > |
|
![]() |
Christchurch Stadium - Back in operation in very tight timeframe The New AMI stadium in Canterbury was a job that waited for no one. The construction program for the stadium was 100 days with tickets pre-sold to the opening game before construction was half completed. A fast and effective piling solution was required therefore Piletech > |
|