Auckland International Airport Ltd - PIER B When Main Contractors were tendering the work for Pier B they were told by AIAL they had less than a year to complete the structure, and it wasn’t yet designed! Hawkins told their client that if they wanted any realistic chance of achieving such a lofty goal – > |
|
![]() |
Frucor Beverages - A limited timeframe and on budget Frucor beverages required a new bottling line to be installed in their current factory to increase production. This included large holding tanks with the capacity of 60,000 litres. In a limited shut down period 8 x 219 dia piles were installed inside the factory utilising > |
|
![]() |
Redoubt Road - Retaining anchors Piletech were engaged to install 178 horizontal screw anchors for an retaining structure above the new SH20-1 motorway link. The team were required to undertake a series of load tests to confirm anchor capacities as well as performing proof testing of some > |
|
![]() |
132 Halsey Street Temporary Works 132 Halsey Street is a premium apartment complex under construction in Auckland’s rapidly growing Wynyard Quarter. Haydn & Rollett is delivering the development on behalf of Willis Bond & Co. A significant sheet pile retaining wall was required to excavate the > |
|
![]() |
Piletech holds down the trench at Kirkbride Anyone who has tried to get to the Auckland Airport at peak time has likely encountered heavy congestion. So when the New Zealand Transport Agency were looking at options for the $146M grade separation of Kirkbride Road – Piletech’s screw piles offered a unique > |
|